Reconstruct creates reality models from all reality data uploaded over the span of construction projects, and organizes them on a timeline according to their capture date. This timeline adds a fourth dimension, time, to your reality display. If there are one or more reality models from one capture date, the capture date is represented on the timeline with an orange dot.
Mouse over the orange dot to see the capture date and click on the dot to view all the reality models occurring on that date. Use the two arrows at each end of the timeline to move one capture date forward or backward.
When a Location is selected, the timeline will filter dates where point clouds have the assigned location.
Comments
0 comments
Article is closed for comments.