Establish a link between schedule activities and BIM elements in Reconstruct (or import a link from Synchro if a Synchro 4D model exists) to visualize the sequence of the construction, trade locations, and/or state of progress.
Drag the blue slider back and forth over the blue 4D BIM timeline at the bottom of the viewer. To see the progress on a specific date, mouse over the timeline to find the date and click on the nearest blue tick mark to jump there. Click on the left timeline arrow to view more dates in the past and on the right timeline arrow to view more dates in the future.
The type of data you see in the viewer depends on the BIM Visualization Mode selected in the control panel.